Implementation of total productive maintenance (TPM) to enhance overall equipment effectiveness (OEE) in a process industry
Authors
Sandeep Kumar Prajapati, Dr. Ranjeet Singh Thakur
Abstract
Overall Equipment Effectiveness (OEE) is the measure through which Total Productive Maintenance (TPM) programmes are justified and audited, yet both the metric and the programme were formalised for discrete, repetitive assembly. Process plants are functionally coupled, their ideal cycle time varies with feed and grade, and cleaning, changeover and validation occupy calendar time whose classification materially determines reported availability. The published evidence is correspondingly weak: it consists largely of uncontrolled before-and-after case studies in which a bundle of pillars is deployed simultaneously and a composite indicator is recomputed afterwards, so neither causal attribution nor pillar sequencing can be established. This paper reports a TPM implementation in an integrated dry-process cement plant conducted under a design intended to remove those weaknesses. Four sections — vertical roller raw mill, preheater and kiln, ball-mill cement grinding circuit and packing plant — were measured over a six-month baseline under a published time-base convention, with reference throughput defined per grade and OEE computed at machine, section and plant scope. All non-productive time was allocated to the six big losses, with a dedicated operator log introduced to capture minor stoppages that generate no maintenance work order. Causes were ranked by Pareto, cause-and-effect and failure-mode analysis, and failure behaviour characterised by MTBF, MTTR and a fitted two-parameter Weibull model. A staged TPM programme sequenced from the loss profile rather than from convention was deployed over three months, and the plant re-measured over a further six months against a structurally similar untreated grinding circuit tracked as a control. Plant OEE rose from 65.68 % to 73.47 %, a gain of 7.78 percentage points (Welch t = 12.70, p < 0.001); the control line moved 0.65 points, giving a difference-in-differences estimate of 7.13 points. Total loss time fell 41.3 %. Contrary to the availability-centred pattern dominant in the literature, performance-rate losses carried 53.0 % of baseline loss time and contributed about 55 % of the gain, and 78 % of recorded minor-stoppage hours generated no work order — evidence that the reported availability bias is partly a measurement artefact. MTBF improved 57.9–91.0 %, MTTR fell 32.1–37.2 %, specific power consumption fell from 34.8 to 32.6 kWh/t and the normalised maintenance cost index by 18.5 %.
Download
Pages:1-11
How to cite this article:
Sandeep Kumar Prajapati, Dr. Ranjeet Singh Thakur "Implementation of total productive maintenance (TPM) to enhance overall equipment effectiveness (OEE) in a process industry". World Journal of Advanced Research , Vol 2, Issue 4, 2026, Pages 1-11

Please enter the email address corresponding to this article submission.